2022 – Sequential batch reactor (SBR) – Saint-Anselme
Parking lots and concrete structures
For 17 non-stop days, more than 25 employees a day worked on emptying, cleaning, injecting cracks, repairing, resurfacing and lining this 120-foot by 42-foot by 25-foot basin.