Skip to content
2023 – 1625 Chabanel – Refurbishment of loading dock – Montreal
Parking lots and concrete structures
The work had to be carried out in two separate phases, as the dock was still in operation. The various comings and goings of the delivery trucks added a further challenge to the project.